 |
Tell A Friend About This Page!
|
 |

Flo-Safe
B
Bonded Secondary
Containment Piping
General
Description
A permanent bonded
secondary containment system for above or below ground, pressure or drainage
applications. This system uses the traditional patented Flo-Safe G split
fitting design incorporating an adhesive to join the the two halves. Flo-Safe
B can be installed with any carrier piping (plastic, metal, glass, etc.)
The split fitting design allows for the testing and inspection of the carrier
pipe prior to closing and testing the containment. |
 |
| Material
Options |
Pipe
& Fittings
Clear PVC |
| Sizes
Available |
Pipe
& Fittings
4" & 6" diameter. |
| Adhesive |
Operating
Temp: - 67 to +250°F
Bond Strength:
1,300 psi
Color: Off white |
| Pressure
Rating |
75
psig |
| Temperature
Rating |
PVC-140°F |
| Containment
Boxes |
Molded
boxes in PP for special containment needs including valves, P-Traps, meters
and flanges. |
General
The system shall be manufactured to allow for the placement of
leak detection equipment. The containment shall be drainable and air testable.
All components of the containment system, including pipe, fittings, leak
detection equipment, containment boxes and floor drains, shall be supplied
by Flo-Safe, Inc. The containment piping shall be joined by two piece fittings
with adhesive bonding agent, secured and thermoplastic pins. The split
fittings shall be reusable.
Materials
All pipe and
fittings shall be clear PVC and supplied by the same manufacturer. Adhesive
material shall be supplied by manufacturer and follow specifications.
Pipe Support
Spacing shall
be determined by the manufacturer based on pipe diameters, pipe materials
and operating temperatures of the product pipe. In all cases, pipes within
the secondary containment pipe shall be supported at not more than 10 ft.
intervals. These supports shall be designed for continuous air flow and
drainage of the secondary containment in place.
Installation
The installing
contractor shall install the system in accordance with the directions furnished
by the manufacturer and as approved by the architect and engineer. Installation
instructions and an installation video shall be provided to the installing
contractor by the manufacturer prior to installation.
Top |